We respect water

In the case of the increasing number of real estate developments in the Budapest agglomeration, the availability of public water and wastewater utilities is not clear.
A common problem in the area is that the increased demand for water cannot be met locally with the capacity of existing systems.

BDL Ltd. has investigated the options for the drainage and treatment of drinking water, wastewater and stormwater for the development of the Pilisborosjenő Power Plant Park and presented several possible options at the concept level in the submitted pre-decision study.

Summarising the results of the cost estimation and cost-benefit analysis of each option, the Commission proposed the preferred option. In the search for realistic technical solutions, the option of building a self-supply system, in addition to upgrading existing regional systems, was developed, quantifying the operational requirements.