BDL was awarded to carry out the below listed tasks for the refurbishment and extension of an existing wastewater treatment plant. The concept should have been created in a way to handle the load caused by the continuously and progressively increasing population count, so it should provide flexible operational alternatives for the present circumstances, and for the predicted double capacity need as well.
Our tasks were:
- technological and hydraulic calculations
- general and technological description
- temporary handling instruction valid during trial operations
- trial operation plan
- list and description of facilities
- Block Flow Diagram (BDF) with mass balance chart
- Process Flow Diagram (PFD)
- P&ID; of the process
- list of machineries
- equipment data charts
- process verification report
- general layout plan
- plant layout with hydraulic connections
- catalogue of connection points
- design and data supply about the facility-segments connection