BDL Környezetvédelmi Kft.

We are present from the beginning of solving environmental issues: from the technological and environmental assessment, through the determination of development directions, the preparation of investment concepts and tender plans, classic civil engineering designing, until trial operation.


The engineering and business knowledge and broad experience of our staff and partners, covers the full technical fields related to design (technology, civil engineering, control engineering and automation), and the complex financial and economic knowledge associated with water utility services, investment planning and implementations.

Treated drinking water (m3)

by the DWTPs we had constructed

Treated waste water (m3)

by the WWTPs we had constructed

Contents - EN

{loadspiderfaq standcategory=0 categories=1 theme=1 show_searchform=0 expanded=0 }

BDL Kft. Kamarai Jogosultságok 2016. 07. hóban

 

Jogosultság jele Jogosultság megnevezése
Tervezés  
VZ-TEL Települési víziközmű tervezése
VZ-TER Területi vízgazdálkodási építmények tervezése
VZ-VKG Vízkészlet gazdálkodási építmények tervezése
GP-T Gépészmérnöki (létesítményi és technológiai)
G-P-T Gépészeti tervezés
G-D-70 Költségelemzés, értékelmezés kockázat
G-D-4 Térfogatkiszorításu kompresszorok
G-D-2 Térfogatkiszorítású szivattyúk és hidromotorok
 

Felelős műszaki, illetve műszaki ellenőri jogosultságok

MV-É Általános építmények építési-szerelési munkáinak felelős műszaki vezetése
MV-M Mélyépítési munkák és mélyépítési műtárgyak felelős műszaki vezetése
ME-VZ Vízgazdálkodási építmények építésének műszaki ellenőrzése
MV-VZ Vízgazdálkodási építmények építési-szerelési munkáinak felelő műszaki vezetése
MV-ÉG Építmények építménygépészeti munkáinak felelős műszaki vezetése
ME-G Építmények építménygépészeti munkáinak műszaki ellenőrzése
 
Szakértői jogosultságok
SZVV-3.2. Ivó- és ipari vízellátás, szennyvízelvezetés, nem szennyvízelvezetési célú csatornázása
SZVV-3.3. Víztisztítás
SZVV-3.4. Szennyvíztisztítás
SZVV-3.7. Hidraulikai szakértő
SZVV-3.8. Vízgépészet
SZVV-1.1. Hulladékgazdálkodási szakértő
SZVV-1.3. Víz- és földtani közeg védelem szakértő
We made an evaluation about operating assets operated by Komárom-Ács Waterworks Ltd. in Komárom city, as follows: The water utility service system’s independent utilities and operating assets have been separated,…
On behalf of the state-owned regional water works in Hungary (hereinafter referred to as the Regional Water Works): Tisza Regional Waterworks Ltd. Transdanubian Regional Waterworks Ltd. Danube Regional Waterworks Ltd.…
The Tettye Forrásház Plc. ordered “The complex system of water utility assets inventory of Pécs, coordination of condition survey, water utility evaluation, determine the basis datas for reconstruction planning (technical…
As a result of the factory’s 150 years of operation, a large amount of pollutants drained into the ground waters: brine protein, lime and sulfur solutions, solutions containing calcium salt,…
Before the detailed design phase BDL completed the stormwater management concept for the settlement, based on hydraulic simulation. In this case, the following aspects influenced the decision for the development…
Improvement of sewer system in Szentendre and it’s agglomeration   Some parts of Szentendre, Tahitótfalu, Leányfalu, Horány and Surány settlements lacked canalization, so the design and execution of several new…
The management of the Dunafin paper manufacturer company decided to implement a new industrial wastewater treatment plant with the hidraulical capacity of 5600 m3/d. The design was carried out with…
Category: municipal wastewater treatment Hydraulic capacity: Q = 1.850 m3/d Biological load: 16 846 PE
  • 2023/11/28

    Our services with ESG approach

    We can provide a full technical and economic service to the design and construction industry, with special attention to operators in the water industry, and prepare them for the practical application of the circular economy and ESG approach.

  • 2023/11/23

    Business-case study for Pilisborosjenő

    We respect water

  • 2023/11/23

    Asset valuation for Tettye Forrásház Zrt.

    Over our 15-year professional relationship with Tettye Forrásház Zrt., this is not the first time that we have carried out asset valuations for municipalities in and around Pécs.

News >

Case study

The remediation of the leather factory at Simontornya

As a result of the factory’s 150 years of operation, a large amount of pollutants drained into the ground waters: brine protein, lime and sulfur solutions, solutions containing calcium salt, chromium (VI) and chromium based tanning material, aliphatic hydrocarbons and toxic metals from paints, solvents and treatment agents.

Read more

Latest references

The drinking water treatment plant in Vietnam

In Central Vietnam, Quang Binh province the water treatment project has been implemented successfully, the project consisted of a 10 000 m3/day capacity surface water intake point with required screens and pumping station, built on the bank of Rao Nan River which serves as the main water base.

Read more

Contact us

Please fill this form to contact with us.

Not a valid name format
Not a valid e-mail format
Invalid Input
Required field

Contact details

BDL Environmental Ltd.

H-1118 Budapest, Rétköz u. 5.

Hungary

 

Phone: (+36-1)224-0670

Fax: (+36-1)224-0671

E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.